Hello,

This is the current status at the stairwell opening. I have now laid insulation and stapler board up to 10 cm against the stairwell opening. Then the formwork will be installed. The builder said that later a screed will simply be poured and then it will crack at the transition from "only screed" to screed with insulation. Is that correct or rather botched work? I have now first installed the edge insulation strip as shown in the picture. But I don’t know if the screed ring will hold then. The stairs or the railing will be fixed there.
This is the current status at the stairwell opening. I have now laid insulation and stapler board up to 10 cm against the stairwell opening. Then the formwork will be installed. The builder said that later a screed will simply be poured and then it will crack at the transition from "only screed" to screed with insulation. Is that correct or rather botched work? I have now first installed the edge insulation strip as shown in the picture. But I don’t know if the screed ring will hold then. The stairs or the railing will be fixed there.