Shell construction completed, start of interior finishing work

  • Erstellt am 2017-09-08 06:35:08

Nordlys

2017-09-18 21:44:43
  • #1
Rigips was installed for me before screed and plaster, the floor ceiling was practically finished, only the stairs were missing. They came at the very end. You just have to open the Velux in the attic, if available, also during drying. Karsten
 

Bau-Schmidt

2017-09-19 08:42:20
  • #2
The room where the connections will be made only needs to be lockable.
 