What is the usual procedure for wastewater in new construction?
If a toilet or bathroom is installed on the lowest floor, you have to go under the slab, right (because of wastewater slope)?
If a toilet or bathroom is installed on the lowest floor, you have to go under the slab, right (because of wastewater slope)?