Hello everyone,
in a few days a blower door test is scheduled. We have installed a decentralized ventilation system, therefore there are several wall penetrations.
These should be sealed for the test. Do you have any tips on how I can do this best? Tape over them? Stick something in? What do you think?
I have attached an example picture: