Screed drying apparently extremely slow

  • Erstellt am 2017-09-14 11:18:59

kaho674

2017-09-21 11:44:45
  • #1
Oh yes, I think it was 600 EUR just for electricity alone for us.
 

KlaRa

2017-09-22 15:13:39
  • #2
A young screed, like young concrete, still contains high amounts of mixing water. This means that only a short time has passed since installation. A 15-week-old screed, on the other hand, can certainly no longer be considered a "young screed".
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
05.04.2017Super disaster - water pipe burst, screed damp31
09.04.2017Screed is too low. Are there standards for this?16
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16

Oben