Good morning,

I would like to get some advice. We had a prefabricated house built through a general contractor. We had a balcony built, but at the time of selection, we decided to install the balcony railing ourselves. Unfortunately, the builder did not inform us that a device would be necessary for the attachment. Now I am looking for companies to fix the railing for us, but all refuse because the facade and insulation would have to be cut open extensively in order to screw the railing onto the wooden beam, and no one wants to take on the warranty. How can we deal with this issue with the house builder? Does the forgotten device count as a construction defect?

Thank you very much for your opinions!
Tessa
 

SaniererNRW123

2022-10-31 12:06:04
  • #2
Well, you ordered and received a house with a balcony without a railing. Since YOU wanted to install the railing yourselves, YOU—not the general contractor—should have sought the conversation. Because the general contractor had no idea what kind of railing YOU intended to install later. Therefore, he also didn’t know what was needed. From my point of view, this is not to blame on the general contractor, but (unfortunately) on you. See to it that you find a solution yourselves. The general contractor is out of the picture. In my opinion, it’s really an expensive lesson. Maybe there is still an easier solution. Sorry...
 

SoL

2022-10-31 12:07:39
  • #3
First of all: General contractor or property developer? I don’t see a defect here at first, or did you say: "Please install the attachment fixture!"?
 

Patricck

2022-10-31 12:51:06
  • #4
Question what was agreed?
Balcony in own work actually means complete balcony, if it was agreed that railing is own work on existing fastening points...
 

Benutzer 1001

2022-10-31 13:58:28
  • #5
Many people have this problem at the latest with the awning, for example. We had considered it and specially ordered the mounting. What surprises me is that no one is tackling it; do you have any special requests?
 

Tolentino

2022-10-31 14:01:14
  • #6
I see that the construction company is also under no obligation. But if the balcony is already there, I also don't see the problem why you have to go through the facade. Can't the railing be attached to the balcony?
 

Similar topics
06.04.2015Our financing with "own contribution"12
09.12.2015Incorrect material delivery for in-house work15
13.07.2017Which personal contribution is worthwhile in house construction?39
27.06.2018Prefabricated house provider with electrical installation as own work14
23.07.2018Financing project as a single with a lot of own effort22
02.07.2019Own contribution in financing a single-family house11
21.08.2019Covered balcony or external10
25.02.2020Assessment of construction project with own labor as well as financing27
03.06.2020Construction cost calculation single-family house architect without own work52
05.06.2020Self-performance single-family house with basement - What is feasible?14
09.08.2020Bank does not accept own contribution206
12.08.2020How to correctly determine the loan amount when there is a lot of personal contribution?15
28.08.2020Assessment of own performance and craftsman's hour10
22.03.2021Railings on ETICS - what solutions are available?11
03.02.2022BEG WG grant option - is personal contribution possible?12
24.03.2022How to realistically assess personal effort?32
01.08.2023Must the balcony above the bay window be the frame?13
14.12.2024Aluminium decking on the balcony - experiences?15
29.01.2025Advice on the size of the balcony overhang on the upper floor23

Oben