Renovate bathroom - "strange" shower cabin

  • Erstellt am 2021-03-27 08:57:55

knalltüte

2021-03-27 21:38:04
  • #1
For timber frame constructions and the bathroom on the 1st floor, an important tip: Try to incorporate a waterproof "black tub" (made of bitumen) during the renovation. It can be done well as a DIY project and protects the rest of the house below against possible moisture escaping, such as unplanned flooding, etc. (which of course should never occur).
 

rennschnecke

2021-03-27 22:22:54
  • #2
Thanks for the tip! I will explicitly address this again with the tiler or the plumber. Better safe than sorry.
 

rennschnecke

2021-03-28 19:07:15
  • #3
So, a tiler was here today, yes actually on Sunday. He wanted 3,000 euros for about 20 sqm of tiles (floor and wall tiles, shower area up to the ceiling, the rest about half-height), excluding tiles. For completely normal 0815 30x30cm, 30x60cm etc. tiles I think we will gratefully decline the offer.
 

knalltüte

2021-03-28 20:23:28
  • #4
Hello, that would be about 8-10 working days based on estimated hourly wages. Since tiling a bathroom is significantly more complex than tiling a square living room, that could definitely be within the realm of reality. Certainly also somewhat influenced by the ongoing unavailability of tilers. I would also get a second offer. Try to get a reasonable flat rate (for both sides) including the previously selected materials - done :cool: (if there is a tiler who agrees to that)
 

rennschnecke

2021-03-28 20:27:02
  • #5
Working time would be 5 days. I find 140 euros/sqm somewhat ambitious. But yes, a second offer will be obtained. Only the tiles will be provided for the material. The rest can be brought by the tiler, as he knows best with which materials he can achieve good results. Attached are also some photos of the bathroom.


 

ypg

2021-03-28 21:11:15
  • #6
With or without demolition of the old tiles?
 

Similar topics
13.08.2017How do I recognize a good tiler for large tiles?13
01.01.2018Order tiling materials yourself - tiles12
13.02.2019Tiler costs 200m² new construction42
26.10.2021Remove the tiler and assign the work yourself or not?19
14.02.2022Painter and tiler evaluation11

Oben