tomtom79
2020-06-27 00:36:37
- #1
Stop
Remove old slabs, remove split and compact with mineral concrete 3-4 cm below the bottom edge of the new slabs. Too much split under the slabs makes them wobble.
Remove old slabs, remove split and compact with mineral concrete 3-4 cm below the bottom edge of the new slabs. Too much split under the slabs makes them wobble.