mirk909
2012-08-02 22:04:21
- #1
The work on the foundation slab is starting! That means all pipes and supply lines will be laid. For my earth collectors (surface) heating, I want to provide pipes in which I can thread the supply and return pipes afterwards! I am thinking of 2xDN150 pipes spaced 30-50cm apart. The bend with 6x15° elbows. Would that be OK? The connection to the manifold (approx. 8 heating circuit distributors in the meadow) is about 15m away from the heating system!! The soil contains clay up to 40m deep with little gravel content. Or would deep drilling be an alternative?