Osnabruecker
2021-11-08 15:29:03
- #1
Tear up/loosen the existing 15 cm and leave it as is, supply material, then maybe tear up again to mix the materials a bit. Then grade to level and compact.
Do not remove anything (unless necessary due to height position).
Do not remove anything (unless necessary due to height position).