Unimatrix
2018-01-14 10:16:14
- #1
ypg:
Oops, your response must have overlapped with mine. Of course I need the breakdown for the construction loan. Although there will also be some own work involved (so then only material costs). And is a rough estimate enough for the banks or do I really have to request cost estimates for each individual item?
Oops, your response must have overlapped with mine. Of course I need the breakdown for the construction loan. Although there will also be some own work involved (so then only material costs). And is a rough estimate enough for the banks or do I really have to request cost estimates for each individual item?