Optical defect yes/no? Height offsets door frames

  • Erstellt am 2020-01-22 20:13:04

tomtom79

2020-01-23 05:08:59
  • #1
Why are the frames connected to the wall, which room is this? The frames are only plugged in.
 

HilfeHilfe

2020-01-23 06:22:38
  • #2
I would have said he can push the frame up a bit since it's not connected

but, not that the action makes everything worse
 

world-e

2020-01-23 07:08:33
  • #3
Looks really awful. It's often unbelievable what kind of work some professionals deliver.

How does it look on the floor? There must also be varying gap widths there.
 

cschiko

2020-01-23 08:29:49
  • #4


I wonder the same, are there then different "joints" at the bottom? Because he would actually have had to set one of the two frames higher each time, which should be visible at the bottom on the floor. Correcting the whole thing is quite a matter. Because the frame is normally slotted together, but also glued to the frame. And the frame in turn is connected to the wall with frame foam. So it's not just done like that, and if further consequences come into play, the proportionality is quickly called into question.

But it would certainly be interesting to first clarify how this height difference came about. So whether it was set incorrectly or whether the frames were differently high afterwards?
 

Lumpi_LE

2020-01-23 08:37:51
  • #5
Such things bother yourself, someone else will never notice them if you don’t point them out. If the craftsman refuses, you can’t do anything; the few millimeters are within the limit if nothing additional has been agreed upon.
 

seat88

2020-01-23 08:42:36
  • #6
The defect could just as well have existed already in the shell construction, the door manufacturer simply installed the frame flush at the top. Of course, with the frame you can see the difference, but back then in the shell construction you could not.
 

Similar topics
14.11.2011Shell construction still this year15
05.09.2015Cracks in masonry (shell construction)14
13.02.2014Mold on wood/ shell construction, is it possible to deduct the advance payment invoice?28
24.04.2015Buy tiles during shell construction24
09.03.2015Received an offer from a builder: Cost of shell construction - experiences?26
27.02.2015Purchase shell construction and complete it including financing15
11.02.2016Cost per cubic meter of built-up shell space14
07.05.2016Buying a shell construction - Experiences21
03.10.2016Single-family house, hillside location, basement half residential/useful area - expensive shell construction?15
20.04.2017Payment plan with 35% after the shell construction, okay?10
05.05.2017Rough construction flat-rate offer - forgotten necessary items11
06.09.2017Add a wind catch later to the shell construction17
07.10.2017From when must the shell construction be dry or sealed?16
18.12.2017Offers for single-family house shell construction and basement received - your assessment?21
31.01.2022Possible savings in self-performed structural work37
27.08.2018New building shell construction selection: Choose a company or architects?52
18.09.2018No offer for electrical work - must the shell construction be stopped?12
09.10.2018Costs for shell construction and roof covering/insulation - fixed price offer okay?25
17.03.2020Doors and frames from different shops?24
07.03.2022Can these doors or frames be painted? Or replaced?11

Oben