Ysop***
2023-02-13 20:15:18
- #1
I would also take a look there, because depending on the thickness of the insulation layer, it might be possible to do something without the height changing significantly, as there are very thin heating systems. I would definitely not mill into the concrete ceiling, but you might need the structural engineer for the screed if the floor construction has been very light so far.