Offer earthworks foundation slab

  • Erstellt am 2017-06-11 11:36:54

Marvinius

2017-06-11 13:24:21
  • #1
75m3 of soil will be removed. Now take the length L and width B of your house and add 60cm each for the working space (minimum). Then you should be able to calculate the depth T that will be excavated: T = 75m3 / ((L+0.6)m * (B+0.6)m). If this T is now within the fill, then you are dealing with the expensive option.
 

Marvinius

2017-06-11 13:26:41
  • #2
You cannot use the material entirely for the backfill. But you could partially mix it with the backfill sand or create a level difference in the garden.
 

Marvinius

2017-06-11 13:32:22
  • #3
The information is of course only a preliminary guideline. Have the company confirm up to which depth they want to excavate. And as a precaution, calculate with the expensive option.
 

Edwina0511

2017-06-11 14:31:06
  • #4
All right...thank you very much for the detailed explanation.
 
Oben