Marvinius
2017-06-11 13:24:21
- #1
75m3 of soil will be removed. Now take the length L and width B of your house and add 60cm each for the working space (minimum). Then you should be able to calculate the depth T that will be excavated: T = 75m3 / ((L+0.6)m * (B+0.6)m). If this T is now within the fill, then you are dealing with the expensive option.