Measure screed residual moisture correctly with Trotec BM31

  • Erstellt am 2018-03-10 13:30:42

josburg

2018-03-10 13:30:42
  • #1
Hello,

for measuring the residual moisture, I bought the Trotec BM31. Unfortunately, I am unsure about the interpretation of the displayed value, whether I can start laying the vinyl. The display shows 48 digits.

I have attached the excerpt from the instruction manual. On the scale, 48 = dry.

But what do the values below in the table mean?

It would be great if someone could help me.

Thank you very much.
 

Caspar2020

2018-03-11 09:46:39
  • #2
These are comparative values from measuring devices that make them reasonable and meaningful.

As the manufacturer of your device already says:



Unfortunately, your value should really only be seen as an indicator (e.g., whether it is worth carrying out the CM measurement).

And the device is not calibrated either.

Only with a proper CM measurement do you perform a depth measurement in the screed, and also the sample quantity (50g to 100g) makes the result meaningful.

From my point of view, the only thing you can do with this thing is to determine that in one place or another, the surface is drier or wetter in comparison. Nothing more.
 

werners81

2018-04-11 20:39:58
  • #3
I also purchased the device to roughly assess the residual moisture of the screed. This works well....we are currently at the peak of the screed program and at about 60 digits in the light areas. Unfortunately, we also have many sintering spots in our anhydrite screed...in these, the value is still over 80!

This is already worrying me because grinding will only be done when the tiler arrives...which doesn't really make much sense since not much will probably change at the sintering spots until then, right?
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
10.05.2015Screed uneven - defect removal refused52
15.05.2015Own contribution: Determination of residual moisture10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
07.08.2016Upper floor without screed - only concrete floor15
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
11.02.2017Heating of screed ready for covering23
05.04.2017Super disaster - water pipe burst, screed damp31
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
05.11.2017Screed in the bathroom applied incorrectly - What to do?18
27.12.2017Underfloor heating heating demand with at least 60 mm screed30
24.07.2023Attach skirting boards later due to screed and joint formation?18
11.10.2024Click vinyl and residual moisture in the subfloor, how high is the risk?15