Many small cracks after concreting

  • Erstellt am 2014-09-06 17:09:25

speer

2014-09-06 17:09:25
  • #1
Hello everyone,
yesterday the concrete basement ceiling was poured at our site. The construction manager called me around 8 p.m. yesterday and told me to water the ceiling. I then drove to the construction site for another 30 minutes and watered it thoroughly. This morning I was there again to water and on the ceiling there were a lot of small, but no deep cracks visible.
A bit of searching on the internet suggests that this indicates the concrete is curing too quickly due to the temperatures. Well, yesterday we measured 28°C. The construction manager has also been informed and will take a look on Monday.

I would be interested to know how serious these cracks are.
 

Bolzen

2014-09-07 09:09:16
  • #2
Get your own expert knowledge. If no post-treatment of the concrete takes place (watering and covering with foil), it can end badly. So: hire an expert! The money is peanuts in relation to the construction sum.
 