Mottenhausen
2019-04-23 12:01:34
- #1
Also request our wastewater disposal before the official connection. It costs something around 300€ and was handled by the GU (= shell constructor in our case). Additionally, a camera inspection is even required for us, so be glad you don’t need that as well.