Eemer 2014-03-09 20:00:42#11.25 deep my architect calculates with 35€ per meter (open and close), without material. We do not have the actual costs yet.
1.25 deep my architect calculates with 35€ per meter (open and close), without material. We do not have the actual costs yet.
WWastl 2014-03-09 21:13:39#4In your rough calculation, warranty, risk factors, etc. are missing. So 55€ per hour is not much. For us, there were always 2 people from the company on site. We paid nearly 1000€ for 10 meters,...
In your rough calculation, warranty, risk factors, etc. are missing. So 55€ per hour is not much. For us, there were always 2 people from the company on site. We paid nearly 1000€ for 10 meters,...
BBauexperte 2014-03-09 23:46:13#5Good evening, Approximately 42m need to be "excavated" About 25m of main pipe for sewage water need to be laid About 41m of main pipe for rainwater need to be laid. I have now received a fixed price. The company charges 900€ for these works including leak testing I think that €900.00 for the number of running meters - even by North German standards - is quite cheap... Rhenish greetings
Good evening, Approximately 42m need to be "excavated" About 25m of main pipe for sewage water need to be laid About 41m of main pipe for rainwater need to be laid. I have now received a fixed price. The company charges 900€ for these works including leak testing I think that €900.00 for the number of running meters - even by North German standards - is quite cheap... Rhenish greetings