josi
2012-03-08 09:42:05
- #1
Hello,
yesterday we laid our laminate flooring and placed an aluminum strip on our underfloor convector. However, our screed was not 100% level, and we had to chip off a bit in one spot. We managed to get it to the right height, but the strip still lifts slightly on one side, even though the entire laminate is already installed.
We fixed it with double-sided tape and mounting adhesive and weighed it down with a full package of laminate.
However, this did not bring the desired result, and it is still lifting.
Does anyone have a tip on how to secure it properly?
yesterday we laid our laminate flooring and placed an aluminum strip on our underfloor convector. However, our screed was not 100% level, and we had to chip off a bit in one spot. We managed to get it to the right height, but the strip still lifts slightly on one side, even though the entire laminate is already installed.
We fixed it with double-sided tape and mounting adhesive and weighed it down with a full package of laminate.
However, this did not bring the desired result, and it is still lifting.
Does anyone have a tip on how to secure it properly?