Hello everyone,
we are currently in the middle of building our house and today the concrete slab was poured. At the beginning of the kitchen planning, we "approximately" indicated to the architect where the sink in the kitchen should be located. Now the drainage planning has been implemented in the foundation and the pipes have been laid. Last week we met with the kitchen planner and found that the drain needs to be about 30 cm further to the right (when standing in front of the sink). According to the construction management, there will be a floor buildup of 22 cm on top (underfloor heating, etc.).
Do you think it would still be possible for the drain for the sink to be built 30 cm further to the right?
Thanks for your help
Steven
we are currently in the middle of building our house and today the concrete slab was poured. At the beginning of the kitchen planning, we "approximately" indicated to the architect where the sink in the kitchen should be located. Now the drainage planning has been implemented in the foundation and the pipes have been laid. Last week we met with the kitchen planner and found that the drain needs to be about 30 cm further to the right (when standing in front of the sink). According to the construction management, there will be a floor buildup of 22 cm on top (underfloor heating, etc.).
Do you think it would still be possible for the drain for the sink to be built 30 cm further to the right?
Thanks for your help
Steven