we have just received the execution description for our slab. It is specified as a so-called energy-saving slab with foundation. The following items are listed as scope:
-> Create fine grading on construction site prepared gravel fill
-> Lay edge elements and 220mm insulation
-> Heating pipes and control technology for the heating zones
-> Connect distribution manifold and install distribution cabinet
-> Reinforcement according to structural engineering
-> Supply actuators
-> Foundation static calculations
-> Installation plan for heating pipes
-> Pour 100 mm concrete B25 and smooth according to the screed DIN
Are there any essential scopes missing here that either still need to be included in the offer or that we should still keep in mind?
Is the described execution of the slab a concrete core activation that is energetically beneficial when using a heat pump, or is that unrelated?
Regards and thanks,
Christian
we have just received the execution description for our slab. It is specified as a so-called energy-saving slab with foundation. The following items are listed as scope:
-> Create fine grading on construction site prepared gravel fill
-> Lay edge elements and 220mm insulation
-> Heating pipes and control technology for the heating zones
-> Connect distribution manifold and install distribution cabinet
-> Reinforcement according to structural engineering
-> Supply actuators
-> Foundation static calculations
-> Installation plan for heating pipes
-> Pour 100 mm concrete B25 and smooth according to the screed DIN
Are there any essential scopes missing here that either still need to be included in the offer or that we should still keep in mind?
Is the described execution of the slab a concrete core activation that is energetically beneficial when using a heat pump, or is that unrelated?
Regards and thanks,
Christian