: I did it like this: Photovoltaic 6.3 kWp on southwest + northwest roof, plus a LG ESS and no separate heat pump meter. The heat pump will be a split unit with 6 kW heating capacity. The ESS and the heat pump will be put into operation in spring; I will then report here later about the operating behavior...