Is high ceiling height possible with controlled residential ventilation?

  • Erstellt am 2016-03-03 11:23:52

nordanney

2016-03-03 12:17:11
  • #1
Exactly! The positions of the spots are determined and then the ceiling including the cables is concreted (either traditionally or with precast ceilings). As I said, that's common – no more suspended ceilings.
 

McEgg

2016-03-03 12:20:47
  • #2
Ok thanks. I didn't know that either.
 

nordanney

2016-03-03 12:37:49
  • #3
Can then look like this before concreting (red: ventilation, grey: spotlights):
 

Mycraft

2016-03-03 13:39:57
  • #4
Well, or just a technical shaft and ventilation ducts on the raw floor... then you don’t have to lower the ceiling and you can also only install ceiling outlets if you don’t want wall and floor outlets... although I don’t understand what the problem with that is.
 

Bieber0815

2016-03-03 22:49:17
  • #5
If you install flat ducts on the raw subfloor (on the raw ceiling), you must plan for an additional 8 cm floor construction (= shell construction height).
 

McEgg

2016-03-03 22:51:09
  • #6
Interesting information. Thank you very much. I will address this during the planning.
 