We are currently building our single-family house, 180sqm on 2 levels. We forgot about the [Vordach] when dealing with the architect. We want one made of concrete with 2 columns. The ceiling of the basement will be installed on Thursday. Is it possible to add such a [Vordach] later??? What about all the permits then??? We definitely want to do it before we move in. Because it probably will never happen afterwards :)
 

Sebastian79

2016-08-16 07:47:42
  • #2
Of course that can be done later - to my knowledge, a canopy is also a secondary component. It's best to just ask the architect, because they are there for such questions ;)
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
05.02.2016Is the canopy over the entrance too dark?20
29.09.2017Extend the canopy of a prefabricated garage11
09.09.2020Canopy - What are the minimum dimension experiences?24
12.06.2022Glass canopy without posts - What kind of attachment is used in ETICS?14
05.07.2023a canopy like no other I have seen before38
16.07.2023Floor plan with canopy despite airspace in an urban villa10

Oben