paintinx
2015-01-21 15:48:53
- #1
Hello dear forum,
one more question about the technique:
See sketch ... under the middle purlin, gypsum boards are now to be installed over the vapor barrier, and since we have already set the profiles for this, we see that a panel lifter (borrowed from OBI) can only work from a height of 150cm.
So how do I – and this is a question of technique – lift the panels with 2 people in such a way that they finish flush with the knee wall at the back and under the middle purlin. It should fit properly ...
Last night that was quite a demanding task – isn't there any professional tip for that?
one more question about the technique:
See sketch ... under the middle purlin, gypsum boards are now to be installed over the vapor barrier, and since we have already set the profiles for this, we see that a panel lifter (borrowed from OBI) can only work from a height of 150cm.
So how do I – and this is a question of technique – lift the panels with 2 people in such a way that they finish flush with the knee wall at the back and under the middle purlin. It should fit properly ...
Last night that was quite a demanding task – isn't there any professional tip for that?