How long does one have to wait for the construction application from the construction company?

  • Erstellt am 2013-09-21 22:42:17

Andreko79

2013-09-24 05:46:39
  • #1
Hi,
I also chose Standard. I wasn't really in the mood to plan everything from scratch. Well, I'll wait another week and then cautiously ask how things are progressing.

Regards
André
 

Saruss

2013-09-24 06:20:58
  • #2
No desire oO. It's about your own four walls and a lot, a lot of money.
 

aytex

2013-09-26 10:20:44
  • #3
Contract for work signed on 27.03. After that, waited 2-3 weeks until the first planning meeting. We had free floor plan design. We changed our draft 6-7 times so that we only finished planning the house at the end of July :-) Additionally, our building window is somewhat unfavorably timed and we often had to wait for feedback from the building authority. On 17.08 we submitted the building application. Now we have to wait.

So signature with the developer until submission of the building application 5 months (due to floor plan design, renegotiation of additional costs, building authority clarification, holiday period, etc.)
 

Hans Max Wurth

2013-11-16 05:12:28
  • #4
Good day,

that depends entirely on the capability of the construction company or their planners or architects. To prepare a building application, the terrain data with elevations of the property are also needed, as these must be drawn in the views and sections. These are usually provided by a surveying office. If the survey data are available and all design questions have been clarified with the client, a building application for a single-family house in conventional construction up to approx. 200 sqm can be prepared within two weeks.

Best regards
Hans Max Wurth
 

Similar topics
02.01.2012Semi-detached house - who submits the building application first, wins?29
29.10.2013Property reserved, construction financing plan, architect/building permit application21
17.12.2014Building application "deferred". What does that mean?19
28.02.2015Building application submitted/open detailed questions/looking forward to suggestions39
15.06.2015Garage - Building Application - Confusion36
30.10.2015Can the building application be submitted this year?14
01.02.2017Building application is becoming increasingly complicated!20
27.04.2017Carport deviation from the building application21
07.06.2017Permeable traffic areas in the building application17
04.08.2017Building application or building notification15
06.12.2017Constantly making the same mistakes in the building application - stupidity or intent?43
20.11.2020Wait with the building application because of the child construction allowance1354
11.05.2018Construction application costs only 40 euros due to exemption application?27
08.08.2018Neighbor objects after approved building application69
14.10.2018Building application - delay due to neighbor's lawsuit - experiences?21
17.12.2018What is set in stone in the building permit application?10
04.01.2019Terrain modeling different from the building application - allowed? (NRW)36
26.02.2019Submit a building application before the land is paid for?11
15.06.2020Period between submitting the building application and moving into the new house11
05.08.2020Building a garden shed... Is a building permit necessary? Detours?17

Oben