Hello everyone,

Soon I want to lay the screed in the bathroom. I am not an expert in this field, do I need to prime the screed first (e.g. with Gisogrund) or first sand it and then prime – or saturate it with resin? What is the best way to proceed here?
 

MODERATOR

2012-08-11 23:11:32
  • #2
Tiling work in the bathroom requires a craftsman with expertise. The risk of water damage caused by improperly laid tiles and incorrect sealing is already present – and that ultimately becomes more expensive than hiring a professional right from the start.
 

2014-06-01 07:58:48
  • #3
Good, if you haven't done that yet, then a professional company is already appropriate. But those who try it themselves and bring calm and patience can also do it themselves.

The subfloor must of course be solid and clean. If it is, then primer is applied. Then carefully check if the floor is level. Then apply the screed.
 

2014-06-03 23:04:53
  • #4
In the bathroom, I would always be cautious when trying that. If it is not done properly and there is water damage, it can be quite costly.
 

2014-06-07 11:52:31
  • #5
That is of course true, and if it is determined in the event of water damage that an amateur laid the tiles, then no insurance will pay for the damage. So always handle it carefully.
 

2014-06-13 10:29:26
  • #6
So anyone who has no clue about tiles and asks such questions here should keep their hands off. It may look easy for a tiler, but skills and experience are required.
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
10.05.2015Screed uneven - defect removal refused52
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
07.08.2016Upper floor without screed - only concrete floor15
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
11.02.2017Heating of screed ready for covering23
05.04.2017Super disaster - water pipe burst, screed damp31
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
05.11.2017Screed in the bathroom applied incorrectly - What to do?18
06.08.2021Height adjustment between tiles and laminate13
11.03.2021Tiles first or plaster first12
29.09.2022Parquet and tiles in one room26
23.12.2023Broken tiles warranty? New apartment from the developer13
20.04.2024Tiling in a level-floor shower34

Oben