Saldier
2022-10-14 19:32:11
- #1
Hello dear forum,
I hope you can help us here.
We want to build a KFW40 prefab house on a slab foundation from [Knecht].
As part of the preparatory construction measures, we would like to carry out the excavation work already. According to the soil report, neither a strip foundation nor a frost footing is necessary.
The soil report states h=80cm for the foundation, in the sample selection protocol the foundation is given as h=90cm.
Are there any experience reports on how deep the foundation usually needs to be for the slab foundation from [Knecht]?
I hope someone can share their experience and help us.
Thank you very much in advance
I hope you can help us here.
We want to build a KFW40 prefab house on a slab foundation from [Knecht].
As part of the preparatory construction measures, we would like to carry out the excavation work already. According to the soil report, neither a strip foundation nor a frost footing is necessary.
The soil report states h=80cm for the foundation, in the sample selection protocol the foundation is given as h=90cm.
Are there any experience reports on how deep the foundation usually needs to be for the slab foundation from [Knecht]?
I hope someone can share their experience and help us.
Thank you very much in advance