GU - final deadline - what questions should we still ask?

  • Erstellt am 2020-10-22 12:40:50

Yaso2.0

2021-01-15 17:04:05
  • #1
Today there was a construction meeting, part of it about remote access and part then on site with the GU.

It took a total of 4 hours and all open questions were answered as far as possible.

The clinker + joint, the interior doors + handle set, interior window sills and the front door were sampled and in addition we increased the ceiling height to 2.76 raw construction measure.

Overall we are paying about 7k for that.

So I never would have thought that even a joint can be sampled :oops:
 