Ground slab is laid - How long is the construction time?

  • Erstellt am 2022-08-21 20:49:03

DaGoodness

2022-08-21 22:32:47
  • #1
Maximum 9 months.
I am absolutely sure.
 

Neubau2022

2022-08-22 06:20:59
  • #2
For safety, calculate with 1 year after the base slab. And I hope that your BU has already ordered the heat pump.
 

Yaso2.0

2022-08-22 08:03:36
  • #3
We started building at the same time last year with the same parameters you mentioned. Except for painting and flooring, the general contractor did everything. Completion was planned for the end of April 2022, which was the case except for minor details. Our general contractor ordered everything immediately after the construction meeting, which was in January 2021, so that all the required materials were already available at the building materials dealer during the construction period. It may also depend on the region where the building is taking place. Our site manager told me in May that the only delays they had were with the heat pumps. I currently know 3 couples/families who are also building with our general contractor, and they are all progressing according to plan.
 

Cori&Patrick

2022-08-22 09:58:28
  • #4


It is ordered, along with the photovoltaic system
As well as all the other parts
 