Hello everyone,
I have another question.
My earthworks contractor used GRK 2 fleece as a separating layer for the foundation, which I noticed afterwards.
However, the soil report states at least GRK 3. Is that a problem? Or should I just add another layer of GRK 3 fleece?
Currently, there is a layer of gravel above the fleece. But there will be at least another 1.5m of gravel on top.
Thank you very much in advance!