Formwork for ground slab

  • Erstellt am 2025-10-06 21:44:29

Teimo1988

2025-10-07 09:51:30
  • #1

Well, instead of an expert, I would first try to have a conversation. I’ve also had roller shutter boxes installed where none were planned or doors placed in the wrong spot. But everything was calmly resolved through discussion and then corrected or, as in the case of the roller shutter box, simply not charged for.
 

In der Ruine

2025-10-07 10:30:28
  • #2
Thanks, now I understand it too.
 

hanghaus2023

2025-10-07 10:38:23
  • #3
Show us the plan excerpt and a photo of the existing condition.
 

grunlilie

2025-10-07 12:09:28
  • #4
Attached is the plan. 6 cm insulation, 28 cm floor slab, 13 cm subfloor. If 28 cm is too much, the mistake might also be in the plan. I think I just have to ask.
 

Nida35a

2025-10-07 12:27:35
  • #5
At the latest now, it would be time for an independent building expert to monitor the quality for you. You can still notice 20 and 28 cm yourself, other errors in house construction you don't even get to notice. Our house building company knew about the inspection, and so did all the workers. The result was, "we have to work properly, this is being checked."
 

grunlilie

2025-10-07 13:20:01
  • #6

You are absolutely right. At first, I thought "what could possibly go wrong." But that is probably too naive and gullible. Unfortunately.
 