Hello everyone,
we are currently preparing the materials for the screed. However, there are different opinions about how to proceed with the floor construction.
We would do it now as follows:
On the raw floor comes 4 cm insulation, then 3 cm tacker board, on top of that pipes for underfloor heating and then the screed.
Is an Alujet Floorjet or a Katja foil needed between the raw floor and the insulation, or is it completely sufficient as it is?
In the area without [FBZ] we would lay a Katja foil on the insulation and then the screed on top.
Please let us know if this is okay!
Thanks!
we are currently preparing the materials for the screed. However, there are different opinions about how to proceed with the floor construction.
We would do it now as follows:
On the raw floor comes 4 cm insulation, then 3 cm tacker board, on top of that pipes for underfloor heating and then the screed.
Is an Alujet Floorjet or a Katja foil needed between the raw floor and the insulation, or is it completely sufficient as it is?
In the area without [FBZ] we would lay a Katja foil on the insulation and then the screed on top.
Please let us know if this is okay!
Thanks!