Hello everyone,
Key data: End-of-terrace bungalow built in 1984. Flat roof covered with foil, foil renewed about 18 years ago. The roof is leaking and needs to be replaced. Since I wanted external insulation, an energy consultant came in the summer. He also provided extensive advice and saw no need for renovation except possibly a heat pump, but that is not the topic now. At my request, he did not prepare a written plan and thus no cost estimate, as I first wanted to wait for the roofer’s offer. Now, after weeks of waiting, no offer has come from the roofer. He has now written to me that due to the structural situation and building physics, he first has to send "his energy officer" and only then can he prepare an offer. My question: Is this sequence correct? First the energy officer, who issues an invoice—then the roofer makes an offer? A renewed energy officer now with costs might then possibly be for nothing if I do not accept the offer from this roofer? And is there currently still any funding for individual measures like roof renovation? I thank you for your comments, opinions, advice.
Best regards Klaus
Key data: End-of-terrace bungalow built in 1984. Flat roof covered with foil, foil renewed about 18 years ago. The roof is leaking and needs to be replaced. Since I wanted external insulation, an energy consultant came in the summer. He also provided extensive advice and saw no need for renovation except possibly a heat pump, but that is not the topic now. At my request, he did not prepare a written plan and thus no cost estimate, as I first wanted to wait for the roofer’s offer. Now, after weeks of waiting, no offer has come from the roofer. He has now written to me that due to the structural situation and building physics, he first has to send "his energy officer" and only then can he prepare an offer. My question: Is this sequence correct? First the energy officer, who issues an invoice—then the roofer makes an offer? A renewed energy officer now with costs might then possibly be for nothing if I do not accept the offer from this roofer? And is there currently still any funding for individual measures like roof renovation? I thank you for your comments, opinions, advice.
Best regards Klaus