Michael1976
2011-06-13 17:26:42
- #1
Hello,
I am now facing the annoying question in my new building: "How do I properly fill the joints in the concrete ceiling?" I am currently still a novice in this field but not really unskilled.
I need a few professional tips.
1. How and with what should I apply the first filler? – That is, how deep and with what kind of material?
2. How and with what should I apply the final filler?
3. How and when should reinforcement tape be embedded?
When, how, and where do I place this so that it is not sanded off? I think at least that this happens if I lay it flush on top of the joint. After step 1 or step 2...???
4. What grit size should be used to sand the joints?
5. With what should the pores in the concrete ceiling be filled, and does the ceiling need to be primed beforehand?
Many thanks in advance for the helpful tips.
Best regards and have a nice holiday
Michael
I am now facing the annoying question in my new building: "How do I properly fill the joints in the concrete ceiling?" I am currently still a novice in this field but not really unskilled.
I need a few professional tips.
1. How and with what should I apply the first filler? – That is, how deep and with what kind of material?
2. How and with what should I apply the final filler?
3. How and when should reinforcement tape be embedded?
When, how, and where do I place this so that it is not sanded off? I think at least that this happens if I lay it flush on top of the joint. After step 1 or step 2...???
4. What grit size should be used to sand the joints?
5. With what should the pores in the concrete ceiling be filled, and does the ceiling need to be primed beforehand?
Many thanks in advance for the helpful tips.
Best regards and have a nice holiday
Michael