Evaluation of construction description in BW for solid house

  • Erstellt am 2025-09-16 12:09:55

ypg

2025-09-16 19:23:28
  • #1
But this reads as an optional service "painting package"
 

BlueLizard723

2025-09-17 09:14:31
  • #2

Exactly, interior plaster is generally executed in Q2 in the offer. Q3 applies to the filling of the drywall or Fermacell boards in the attic at the collar beam layer and the roof slope.
 

MachsSelbst

2025-09-17 18:44:38
  • #3
White tank against pressurized water 2025 in Baden-Württemberg for 70,000 EUR? I’d be surprised if you still get that price in the East. A prefabricated garage on the internet around 6-7,000 EUR. Plus base slab and all the stuff around it, so easily 25,000 EUR if the builder does it right away.

550,000 - 100,000 basement - 25,000 garage - 30,000 incidental construction costs = 395,000 /133 = 2,962 EUR/m²

Tiles for 35 EUR/m². Well, take ones for 60, with the 30, 40m² you need for the bathroom and guest WC, that costs 750-1,000 EUR. That gets lost in the shuffle of the additional costs that come up anyway out of turn.
 
Oben