Hello forum,

my electrician is unfortunately still on vacation, so I am hoping for a quick answer here.

What kind of power cable must be run from the supplier’s cable, in our case [Süwag], to the distribution box in the basement?

Best regards
Florian
 

Sebastian79

2015-09-03 13:36:05
  • #2
You mean the thickness? Your network operator knows that - do you want to concretize KG pipes yourself? I would first talk to the supplier to see if they accept that - normally they do everything, i.e. the entry into the house.

They didn't do anything there at all - then they can't complain either ;)
 

alexm86

2015-09-03 13:48:42
  • #3

Your electrician has to calculate that based on your requirements.
 

Doc.Schnaggls

2015-09-04 14:07:33
  • #4


Hello,

I dare to doubt that.

Laying and selecting the cable is the responsibility of the network operator, who also installs the meters and makes the connection.

Does a multi-utility connection come into your house, or do you install individual entries?

Regards,

Dirk
 

alexm86

2015-09-04 14:20:13
  • #5
Yes, after the electrician submits the application, stating the required number of kW after prior calculation. Without application and calculation, the supplier cannot take any action.
 

Sebastian79

2015-09-04 14:23:15
  • #6
Nonsense - with a single-family house you have a standard connection anyway - the application is made by the builder themselves - an electrician has nothing to do with it.
 

Similar topics
15.02.2011Building permit application12
18.11.2016Electrician's invoice after 2.5 years - What are my rights?18
12.05.2017Is an advance payment to an electrician lawful?23
01.08.2019Trouble with the electrician / tolerance range?!42
20.02.2020What does the electrician do during the shell construction phase?19
23.03.2020Building law: Electrician refuses to continue78
21.07.2021Problem with the electrician - what would you do?78
30.12.2020Current processing time for construction financing applications at banks69
03.12.2024Wibank Hessen Loan Application Documents and Experiences55
09.07.2023Electrician Cost Estimate - New Installation22
25.09.2023The supplier has incorrect meter numbers in the system - what to do?42
19.07.2024Application KfW 442 Solar Power for Electric Cars42

Oben