Hello,
I would like to ask for your opinion, I am currently in the planning phase for our new single-family house.
Single-family house with basement and attached, basement garage.
The finished floor level in the single-family house basement is 16cm higher than in the garage basement.
The meter cabinet and the photovoltaic inverter will be located in the garage basement.
The electrical distribution for the single-family house will be in the single-family house basement.
How would you connect the electrical distribution of the single-family house to the meter cabinet and bring the photovoltaic strings from the single-family house to the garage basement?
Options:
- In both basements, provide additional entries each and create a connection through the ground using conduit.
- Embed conduits in the ground slab from the garage basement to the single-family house basement; however, this would breach the (thermal) decoupling of the two slabs.
- Embed a conduit in the garage slab up to the exterior wall of the single-family house and there jump up to OKRFB to continue laying the conduit on the rough floor in the single-family house.
Feel free to suggest further ideas :)
I would like to ask for your opinion, I am currently in the planning phase for our new single-family house.
Single-family house with basement and attached, basement garage.
The finished floor level in the single-family house basement is 16cm higher than in the garage basement.
The meter cabinet and the photovoltaic inverter will be located in the garage basement.
The electrical distribution for the single-family house will be in the single-family house basement.
How would you connect the electrical distribution of the single-family house to the meter cabinet and bring the photovoltaic strings from the single-family house to the garage basement?
Options:
- In both basements, provide additional entries each and create a connection through the ground using conduit.
- Embed conduits in the ground slab from the garage basement to the single-family house basement; however, this would breach the (thermal) decoupling of the two slabs.
- Embed a conduit in the garage slab up to the exterior wall of the single-family house and there jump up to OKRFB to continue laying the conduit on the rough floor in the single-family house.
Feel free to suggest further ideas :)