I would then have to lay foundations at the back of the house as well. Then there would be six point foundations, three in front, three at the back.
At the back of the house, I would have to go 2.5m deep, as deep as the excavation pit was. All the drainage gravel would have to be removed. It would be significantly more complicated than connecting it to the house.
 

Steven

2020-08-28 18:35:00
  • #2

Hello

Create a connection every 50cm with 12mm iron.
That is not so easy either.