Costs for work planning are reasonable

  • Erstellt am 2020-05-12 12:54:13

face26

2020-05-12 13:37:44
  • #1


Well, if he offered it including finishing etc., and there was carpet in the children's room but 80x80 tiles + sealing etc. in the bathroom are included, then an additional charge besides the replanning might be justified... but this here is really "from and to" :O
 

Vicky Pedia

2020-05-12 13:55:13
  • #2
It goes on: 90%, and there is still no roof, no windows, plaster, screed, installation .... hands off!
 

Matthew03

2020-05-12 13:57:19
  • #3
I assumed the shell construction... but more information from the OP is missing for that, yes.
 

Vicky Pedia

2020-05-12 13:59:37
  • #4
The prices are a dream (for the entrepreneur)! Take a wall: A mason builds it in 0.5 days (costs 4 hrs x 45 EUR). Plus 100 EUR material and 15% surcharge. That makes 322 EUR (values calculated generously). Round up to 400. Where do the 1300 come from then? I have a very, very bad feeling!
 

11ant

2020-05-12 14:06:32
  • #5

Which bank would even go along with that?
 

Zaba12

2020-05-12 15:22:37
  • #6

I already saw it but it doesn’t matter anymore.