M.arco
2017-09-28 09:56:24
- #1
Hello everyone,
I have been following this forum for quite some time.
In June, we decided to build with the company Massivhaus Mittelrhein. Apart from some disagreements, everything has been going quite well so far.
Now, in week 46, the earthworks are scheduled, and we have received the following offer:
Pos Quantity Description Unit price Total price
.
Create foundation level, includes: €3,640.00
Remove topsoil, store it on the side.
Excavate foundation pit including working space according to
plan specifications, store excavated soil
on the side.
Create foundation cushion, includes: €6,262.00
Mineral mixture approx. 170 t with grain size
0/32 according to plan specifications and
soil report, deliver and install,
as well as conduct a dynamic
plate load test
at 2 measuring points.
(Materials delivered free on site)
Infrastructure for single-family house €3,715.00
Constructed according to plan specifications.
Includes:
Wastewater fittings in KG
DN 150 and DN 100, deliver and
install.
Inspection shaft system in KG DN
400/300 including cast iron cover class B,
deliver and install. Including filling sand
and all expenses free on site.
Is this offer okay? Can someone tell me something about it?
The following conditions:
Excavation 50 cbm
Bedding cushion 50 cbm
Foundation pit 17x11m
Thank you very much and best regards
I have been following this forum for quite some time.
In June, we decided to build with the company Massivhaus Mittelrhein. Apart from some disagreements, everything has been going quite well so far.
Now, in week 46, the earthworks are scheduled, and we have received the following offer:
Pos Quantity Description Unit price Total price
.
Create foundation level, includes: €3,640.00
Remove topsoil, store it on the side.
Excavate foundation pit including working space according to
plan specifications, store excavated soil
on the side.
Create foundation cushion, includes: €6,262.00
Mineral mixture approx. 170 t with grain size
0/32 according to plan specifications and
soil report, deliver and install,
as well as conduct a dynamic
plate load test
at 2 measuring points.
(Materials delivered free on site)
Infrastructure for single-family house €3,715.00
Constructed according to plan specifications.
Includes:
Wastewater fittings in KG
DN 150 and DN 100, deliver and
install.
Inspection shaft system in KG DN
400/300 including cast iron cover class B,
deliver and install. Including filling sand
and all expenses free on site.
Is this offer okay? Can someone tell me something about it?
The following conditions:
Excavation 50 cbm
Bedding cushion 50 cbm
Foundation pit 17x11m
Thank you very much and best regards