Scout
2021-10-13 14:21:48
- #1
Yep. Upper floor with KS hatched through, filled red bearing, not filled not bearing. And completely unfilled like on the bottom floor in the bathroom is drywall
and in the basement the interrupted hatching is reinforced concrete (on the left of the plan) or partition wall in KS bearing red hatched through

and in the basement the interrupted hatching is reinforced concrete (on the left of the plan) or partition wall in KS bearing red hatched through