Alex124
2022-11-28 09:09:54
- #1
That is already appropriate if
- the 8m mound has already been distributed before
- the topsoil and most of the gravel have already been installed before
- all modeling work has already been completed before
- the L-stones are only 60cm high, or have already been set
This size is used for excavating small foundations, laying small trenches or pipelines, fine grading, ...
Look, your mound is 4 times as high as the little excavator...
- the 8m mound has already been distributed before
- the topsoil and most of the gravel have already been installed before
- all modeling work has already been completed before
- the L-stones are only 60cm high, or have already been set
This size is used for excavating small foundations, laying small trenches or pipelines, fine grading, ...
Look, your mound is 4 times as high as the little excavator...