Building waterproofing OK top row of stones?

  • Erstellt am 2015-10-30 11:33:03

Laie2303

2015-10-30 11:33:03
  • #1
Good morning everyone,

together with our architect, we planned a single-family house. Now, contrary to the known KMB waterproofing (1st layer KMB, 2nd layer KMB with fabric insert and applying the insulation up to the 1st course of bricks), our architect has specified a 2-component crack-bridging mineral sealing slurry (MDS). Similar execution steps as above.

Now I am not sure whether the waterproofing should end at the 1st course of bricks or whether it should also be carried up to the 2nd course of bricks (5 cm) as in the detail. I am wondering how this should be executed on site?

What do you think about it? Is that correct? Can this be reasonably expected from the contractor?
Thank you very much in advance.

Regards
 

Laie2303

2015-11-01 19:11:12
  • #2
Good evening,
does no one have experience with this? :(
 

Similar topics
11.10.2017Sealing on Styrodur insulation?14
11.11.2017Sealing terrace exit / door in double-shell masonry10
22.07.2017Horizontal sealing of the base slab24
04.09.2017Sealing the garage with a concrete floor?21
21.10.2017Sealing the base slab before the roof is installed19
02.09.2019Properly installing the dimple membrane, base sealing, drainage?15
15.04.2019Missing sealing in bathrooms detected after 16 years.13
12.07.2023Sealing of floor-to-ceiling windows from the outside74
15.05.2021Sealing garden wall to neighbor10
06.07.2021Sealing of my clinker facade16
10.07.2021Is basement waterproofing available in the old building from 1971?12
15.07.2021Balcony slope and waterproofing costs12