Hello everyone,

we plan to build a split-level pitched roof house with a half basement. We have received a few offers and the prices range between 19,000 EUR and 50,000 EUR. Unfortunately, we are quite inexperienced when it comes to this matter, and the offers are difficult to compare due to the lack of description of the basement. What should we pay special attention to, and how much will such a basement approximately cost? The house has a footprint of 11 m x 10 m and the north part is to be basemented, approximately 11 m x 5 m.

Many thanks in advance.
 

Bauexperte

2014-03-31 13:12:40
  • #2
Hello,


A partial basement is rarely worthwhile, as it almost costs as much as a full basement. The 19,000 EUR presumably only refer to the pure masonry work without earthworks, insulation, doors, wiring, light shafts, etc. The 50,000 EUR offer can therefore be quite accurate.

You should always insist on a meaningful description of the basement. If the contractor asked for an offer refuses this, step back from further considerations, because usually then even more is amiss ;)

A partial basement of the size 11.00 x 5.00 m should cost about 45,000 EUR including the necessary earthworks.

Best regards from the Rhineland
 

€uro

2014-03-31 13:16:07
  • #3
Bauexperte is right, "half-pregnant" is rarely helpful ;-)

v.g.
 

zovima15

2014-03-31 13:32:31
  • #4
Thank you very much in advance for the really quick and informative answers. I will upload the construction description of the basement for 19 TEUR this evening. According to the statement of the civil engineer who prepared the offer, everything is really included here, so no hidden costs.

How much more would a full basement cost?
 

zovima15

2014-03-31 17:34:19
  • #5
I have now scanned the first page of the construction description. This is what I have available for now. Can you make out anything from it or is something missing? What points should I specifically inquire about? What do you think?
 

Similar topics
16.01.2012Single-family house construction description - experiences?10
09.06.2013Costs of earthworks without basement15
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
07.03.2014Earthworks are starting, but I need a tip.12
26.04.2016Sand, gravel, and other earthworks32
28.09.2016Evaluation of earthworks offer14
28.08.2017Earthworks: Making the right choice of provider14
29.12.2017Is it possible to found a single-family house without concrete and earthworks?21
25.01.2018Earthworks and shell construction, who bears the warranties?10
29.10.2018Earthworks in the construction performance description17
08.04.2019Earthworks costs in Bavaria15
14.06.2019Costs for earthworks18
08.09.2020Earthworks costs, hillside house14
23.07.2021Earthworks... Dispute with the occupational disability insurance20
27.11.2021Ancillary construction costs for earthworks according to soil report16
15.03.2022Cost planning for earthworks33
29.04.2022Designing hillside property - Earthworks / Retaining wall cost options26
10.05.2022Carry out earthworks with equity capital?10
07.02.2025Cost issue for earthworks on a slope22

Oben