LLoads 2018-05-07 21:36:16#1I would be interested to know how much filling the working space per cubic meter is allowed to cost approximately – or what you have paid for it. It seems to me that my earthworks contractor wants to rip me off here...
I would be interested to know how much filling the working space per cubic meter is allowed to cost approximately – or what you have paid for it. It seems to me that my earthworks contractor wants to rip me off here...
Ssco0ter 2018-08-13 15:45:45#2We paid about 4200 EUR, with Lava. I think around 15 EUR per cubic meter. It was a basement on a slope, meaning one side was filled less.
We paid about 4200 EUR, with Lava. I think around 15 EUR per cubic meter. It was a basement on a slope, meaning one side was filled less.