Basel
2018-02-16 10:09:54
- #1
Hello forum,
Our windows will arrive soon and the interior construction is about to start.
My question is whether I should insulate the wooden beam ceiling before plastering and screed or after?
Construction from top to bottom
Cold attic
OSB boards
240mm collar beam
240mm insulation clamp fleece
Vapor barrier
Battens
Drywall/Fermacell
Thank you
Our windows will arrive soon and the interior construction is about to start.
My question is whether I should insulate the wooden beam ceiling before plastering and screed or after?
Construction from top to bottom
Cold attic
OSB boards
240mm collar beam
240mm insulation clamp fleece
Vapor barrier
Battens
Drywall/Fermacell
Thank you