Hello everyone,

we received the first offers today for the construction of the sewage and wastewater pipe.

Regarding the matter itself:
We have a new construction project.
Currently, there is a transfer shaft on the driveway.
The wastewater pipes come in at two points (middle gable and middle house front).

Now, in the offers, a revision shaft is planned where the two pipes come together and then go about 4m further with a pipe to the already existing transfer shaft. This revision shaft is supposed to cost a whopping 1,400 EUR, plus backfill material and excavation disposal (because clay is not suitable).

My question is whether the revision shaft is necessary if there is already a transfer shaft on the property? It would bother me to have two covers on the driveway.

Thank you in advance.

Best regards
Conrad
 

Der Da

2013-08-30 13:54:53
  • #2
What does your development plan say? If a manhole is required, you must build it, sometimes even 2 if a separate sewer system is present. If not, leave it out. When in doubt, ask the local water supervisor.
 

Similar topics
11.03.2015Planning optimal arrangement of house, garage, and driveway13
23.07.2016Construction of the driveway with gravel, crushed stone, and paving18
28.11.2018Pave a 100m² driveway49
27.04.2018City villa 190m² with driveway & garden on the south side30
14.08.2019Surface for the driveway?17
20.01.2022Length / Slope Entrance Garage / Carport10
03.09.2023Repave driveway, drainage, costs?17
11.10.2023Small plot, small driveway - space needed to turn around43
18.05.2024Driveway stones from Kann in light gray16
06.08.2024Property driveway ideas, experiences?11

Oben