Tiler tile work not done properly

  • Erstellt am 2024-04-14 16:20:18

PiMa2711

2024-04-14 16:20:18
  • #1
Hi everyone, we are currently having our bathroom done for 13,000 and the tiler did not fully apply adhesive on the tile for the shower. I asked him and he said "with a 30/60 tile that is not necessary." Is that correct? As soon as I google tile work, you see everywhere that tile adhesive is used and not just in spots. Thanks in advance
 

ypg

2024-04-14 22:17:07
  • #2

What do you mean by that? Do you mean the adhesive underneath?
 

hanghaus2023

2024-04-19 09:31:01
  • #3
If you can't describe well, pictures help.

How many points are there per tile?
 

Benutzer210

2024-04-28 18:29:54
  • #4



The colleague described everything correctly. If he says "fully covered," he most likely means underneath the tile. I don’t know any tiler who applies the adhesive on top of the tiles.
 

Similar topics
13.08.2017How do I recognize a good tiler for large tiles?13
01.01.2018Order tiling materials yourself - tiles12
13.02.2019Tiler costs 200m² new construction42
26.10.2021Remove the tiler and assign the work yourself or not?19
14.02.2022Painter and tiler evaluation11

Oben