Survey Kreuzau-Drove

  • Erstellt am 2012-07-30 17:08:10

Mariella

2012-07-30 17:08:10
  • #1
Hello

what is to be said about the following surveying costs?

Deduction from the official site plan: 1047
Rough staking out: 117
Fine staking out 473
Building survey 830
All plus VAT
 

Bauexperte

2012-07-31 01:47:00
  • #2
Hello,


They are within the usual range according to HOAI; why do you ask?

Kind regards
 

Mariella

2012-07-31 10:34:13
  • #3
I am in an online group of our property developer. and there is also an exchange about it and the prices for the above-mentioned services start from a total of 1200 up to 2500. And I am among the most expensive. Is it regionally different?
 

Bauexperte

2012-07-31 10:56:53
  • #4
Hello,


The bare numbers rarely allow a comparison; overall, however, they can all be correct. It depends on the scope of services commissioned by the surveyor: is only the preliminary location plan requested or perhaps also the rough staking out? For all required service levels of the surveyor for new construction, TEUR 3 including VAT are absolutely fine. Since all surveyors nationwide have to bill according to HOAI, deviations should tend to zero – unless the best friend happens to work for a surveyor ;)

Best regards
 

Similar topics
02.12.2013Are surveying costs negotiable with the surveyor?10
28.02.2019HOAI or why architects have no interest.....38
04.01.2022Architect, contract according to HOAI 2013 - refuses to provide service36
18.05.2021Rough staking / Fine staking14
27.05.2022Architect - Flat-rate offer instead of HOAI for single-family house12
22.11.2022Rough staking changed, excavation incorrect11
01.01.2023Structural engineer according to HOAI or flat rate offer?13
03.03.2023Cost estimation for rough staking out and detailed staking out14
28.09.2024Architect commissions surveyor without the homeowner's consent.45

Oben